Moving manufactured homes costs $2,550–$5,700 for a two-section home taken 10 road miles, and $9,500–$21,500 for the same home taken 1,000 road miles. Both figures are the haul alone, for a quiet time of year with nothing else added. What moving manufactured homes cost in full also turns on the home's age and labels, the paperwork that releases it, and installing it again at the new site.
Three moves and what moving manufactured homes cost for each
The haul is priced per section, because each one travels on its own truck. Distance matters, but on a short trip the count of sections matters more. These three moves show how the rest of the budget builds around that figure.
A used single-wide bought 60 miles away
The haul for one section costs $1,000–$2,600 at 10 road miles, and somewhat more at 60, because the fixed costs of prep, permits and a truck's day stay the same while the miles add a little. The bigger unknowns are the seller's side: who disconnects the utilities, who takes off the skirting, and whether the home is fit for the road. Settle all three before you pay for the home.
Your own double-wide moved to land you bought
Moving manufactured homes costs $2,550–$5,700 for the drive across a county, but land with no pad, no power and no septic or well needs work before delivery. A foundation, utility lines and a driveway the truck can use are priced by other trades, and on raw land they can cost more than the move itself.
A triple-wide across several states
Over 1,000 road miles, three sections cost $14,500–$32,000 to haul. Each state on the way issues its own oversize permit, and a home this wide may need escort vehicles for part or all of the route. A long move like this one is where moving manufactured homes cost the most, so it is worth asking whether selling and buying at the destination would cost less.
Manufactured home or mobile home: why the label matters
Homes built on or after June 15, 1976 are built to HUD's Manufactured Home Construction and Safety Standards, the HUD Code, and are called manufactured homes. The code applies to homes whose first stage of production began on or after that date, under 24 CFR 3282.8. Homes built before then are mobile homes in HUD's terms, and the HUD Code generally doesn't cover them.
Each transportable section of a HUD-code home carries a certification label: a small aluminum plate fixed to the outside, about a foot up from the floor at the taillight end, under 24 CFR 3280.11. A separate data plate inside, often near the main electrical panel, records the factory, the date of manufacture and the wind and roof-load zones the home was built for. Find both before you get quotes. Many parks, lenders and permit offices ask for them, and a missing label can hold up a move or stop it, which changes what moving manufactured homes cost before the truck is even booked.
Condition and whether the home can travel
No federal rule sets a maximum age for moving a home. The limits come from three places: the park or town you move to, the permit office, and the home's condition. Before quoting, a transporter looks at the steel frame, the hitch and the running gear, the axles and tires that let the home roll. Rusted frame members, a sagging floor or a weak roof may need repair first.
Those repairs belong in what moving manufactured homes cost, even though no transporter lists them. Ask the transporter to inspect the home in person, and get any repairs it wants written into the quote, so you can judge whether the home is worth the trip.
Paperwork that comes before the truck
Moving manufactured homes cost time at the county office as well as money on the road. Plan for these, and ask your county or state which apply to you:
- The title. The home needs a clear title in the seller's name, or in yours. A home that was tied to its land as real property may need its status changed before it can move as personal property.
- Any lien. If a loan is still owed on the home, the lender has to agree to the move or be paid off first.
- Property taxes. Some counties issue a moving permit only once the home's taxes are paid up to date.
- The park's paperwork. The park you leave may want written notice, and the park you move to usually approves the home before it arrives.
None of these papers has a fixed price, but each takes time to arrange, and the move can't be booked until they're done. A late permit is a common reason that moving manufactured homes costs more than the first quote.
Installation, the other half of moving manufactured homes cost
Setup is a construction job, not a moving job. Federal Model Installation Standards in 24 CFR Part 3285 set the minimum for a new home's first installation, through the manufacturer's installation instructions, and federal rules in Part 3286 require installers of new homes to be licensed by the state or by HUD. For a home that has been lived in and moved, the state's own rules decide what applies, so ask your state's manufactured housing office.
The installer places each section on piers or a foundation, levels it, anchors it against wind, joins the sections and seals the seam between them. Utility hookups follow, often by separate licensed trades, and many places inspect the work before you move in. Get the installer's quote in writing alongside the transporter's, because moving manufactured homes cost the full sum of both.
Buying a used manufactured home to move
A used home can be a bargain, but its price is only the start. Before you agree to buy, check the HUD labels and the data plate, confirm the title is clear, and ask a transporter to look at the home and the route. Then add the haul, the teardown, the setup at your site and the permits to the asking price.
If that total beats a home already sitting on a site like yours, the move makes sense. The calculator above gives the haul for your home's width and your two ZIP codes in about a minute, which is the first line in what moving manufactured homes cost from lot to lot.